Middlesbrough Golf Club Brass Castle

Welcome to Middlesbrough Golf Club

Course Manager

 
 
Winter Maintenance Programme 2009 / 2010
 

  • Remove and pick up leaves from all areas of the golf course (12 weeks work)

  • Remove turf, raise and re-level Ladies 8th tee and turf with a shade tolerant turf.
  • Remove scrub from waterway in front of ladies 8th tee (near bridge).
  • Remove turf and re-level winter tee on Men’s 7th tee and turf with a shade tolerant turf.
  • Verti Drain all fairways, tees, and walk off areas from greens and tees.
  • Drain wet areas around greens to include holes 2, 3, 10, 13, and 15.
  • Remove existing tree stumps from all areas of the golf course (70 in total)
  • Spray fairways, tees, green surrounds and walk off areas with worm irritant and soluble iron.
  • Earthquake greens, to relieve sub surface compaction and improve soil porosity and water percolation.
     
    The successful completion of all winter maintenance work must take into consideration adverse weather conditions.
     
    John Talbot
    Course Manager
    14th October 2009